Pile Foundation Construction of 7000t/d Clinker Cement Production Line Optimization and Upgrading Technology Improvement Project of Jiangsu Yicheng South Cement Co., Ltd

3/31/2023 2:40:05 PM

4059醉红颜

The pile foundation construction of 7000t/d clinker cement production line optimization and upgrading technology reform project of Jiangsu Yicheng South Cement Co., Ltd is located in Yixing City, Jiangsu Province, invested by Jiangsu Yicheng South Cement Co., Ltd.

The project is the construction of bored piles, pre-stressed pipe piles and cement mixing piles, the total number of piles is more than 6,000, the bored piles are 800mm, 1000mm and 1200mm in diameter, the total number of bored piles is more than 1,600, including more than 400 piles with a diameter of 800mm, more than 1,000 piles with a diameter of 1,000mm and more than 80 piles with a diameter of 1,200mm. The pipe pile is PHC-600 (130) pre-stressed pipe pile with a diameter of 600mm and AB type, and the amount of pre-stressed pipe piles is more than 300. The mixing pile is a cement mixing pile with a diameter of 500mm and a cement mixture of 15%, and the quantity of cement mixing pile is more than 4,000.

The pile foundation construction project of 7000t/d clinker cement production line optimization and upgrading technology improvement project of Jiangsu Yicheng Nanfang Cement Co., Ltd. was started on July 2, 2022 and completed on October 24, 2022, with a total construction period of 115 calendar days.

The pile foundations were tested by the third party with 100% passing rate. The pile foundation construction of 7000t/d clinker cement production line optimization and upgrading technology improvement project of Jiangsu Yicheng South Cement Co., Ltd. has won the approval of the supervisor and the owner in all aspects of construction management.

 

Add:NO.555 Huaian Road(west),Shijiazhuang City,Hebei Prov. P.C.:0502271   Tel:0311-66723100 66723200 Fax:0311-66723277  
Copy right:China Hebei Construction & Geotechnical Investigation Group Ltd. 2008